Eight-Week Residential Refurbishment Completion
RCS completed an unfinished residential refurbishment in eight weeks, coordinating electrical, building and external works for a December 2024 rental handover.

Completing an unfinished refurbishment
RCS took over a substantial unfinished refurbishment at a private residential property and completed the remaining project within an eight-week programme between October and December 2024. The work brought together electrical installation, three bathrooms, a complete kitchen, flooring, decoration and extensive external improvements.
The property owner had experienced more than two years of interrupted progress and was left with a long list of incomplete works. RCS’s brief was to bring the outstanding trades and finishing work together and hand the property over for the rental market.
The project involved over 24 trades within a short delivery period.
Electrical, building and finishing work completed
Electrical installation and building services
- Completion of electrical installation and wiring, including a new distribution board and adjustments to existing wiring.
- Specialist extraction installation.
- Boiler and water-heater commissioning.
- Drainage works.
Kitchen, bathrooms and interior refurbishment
- Full kitchen installation and three bathroom installations.
- Flooring throughout, including preparation of uneven floors and new hard floor finishes.
- Replacement joists where required as part of the refurbishment.
- Making good walls, plastering and full decoration.
- Woodwork, doors and framing.
- New windows and external doors.
Landscaping, access and external work
- Ground clearance and removal of waste left from earlier building works.
- Porcelain landscaping and a new lawn.
- A new block-paved driveway and fencing.
- Garage installation and roof repairs.
The completed property
The photographs below show the finished property following RCS’s completion and handover. Select a photograph to view it in full.






Earlier property condition: February 2021
These archive photographs are from the property’s February 2021 Savills auction listing. They show its earlier condition, before the intervening works and before RCS’s appointment in October 2024. RCS completed the remaining refurbishment; the full change since 2021 should not be attributed solely to RCS.


Photographs reproduced with permission.
Handed over for the rental market in December 2024
RCS completed the project within eight weeks and handed the property over for the rental market in December 2024. The scope extended beyond visible finishes to include flooring preparation, joist replacements, electrical completion, drainage and commissioning work alongside the kitchen, bathrooms and external areas.
For property owners and landlords, this project demonstrates RCS’s ability to bring a varied package of outstanding work through to completion under one coordinated programme.
Need help completing a refurbishment?
Tell us the property location, the work already completed, the outstanding items and your target handover date. Photographs and an existing scope of works help us understand what is needed before discussing a site visit and quotation.
Explore our electrical, building and maintenance services and the Church Street complete house renovation for another example of residential refurbishment.