RCS case study

MTS & Cool Repair — Live-Site Commercial Refit Across Two Industrial Units

A £325,000, eight-month refurbishment and electrical upgrade delivered for MTS & Cool Repair across two operational industrial units in Bulwell.

ClientMTS & Cool Repair
LocationMarlborough Court, Bennerley Road, Bulwell, Nottingham NG6 8UY
Completed2024
ServicesElectrical, building, UPS, security and data
Delivery period8 months
Project value£325,000
Headline resultTwo operational units refurbished in support of the client’s sale-readiness programme
The upper floor during application of the grey floor finish. MTS & Cool Repair, Bulwell.

View the project photographs: construction, electrical work and finishes.

The project

In 2024, RCS Maintenance Group was appointed by MTS & Cool Repair to deliver a comprehensive commercial refit across two industrial units at Marlborough Court on Bennerley Road, within Blenheim Industrial Estate in Bulwell, Nottingham. The central challenge was to complete major electrical, building and workplace improvements while the business remained operational and continued trading.

The eight-month programme brought multiple specialist workstreams under one accountable delivery team, with the work carefully phased around the client’s operational requirements.

The brief

The client needed both units refurbished and rewired to support its present operations and future electrical demand. The project also had to improve power resilience, strengthen asset security, increase usable floor space and create a professional office environment for the team.

  • Full refurbishment and rewiring of two industrial units
  • Mains wiring upgrades to meet the required electrical demand
  • A suitable UPS solution supporting critical requirements across both units
  • A specialist alarm system to protect the client’s assets
  • Installation of a mezzanine floor
  • Upgrades to existing areas for improved fire protection and safety
  • Creation of a new office working environment
  • New kitchen facilities and data installation

Delivering within a live business

Working within an active trading environment required more than technical capability. The programme had to be sequenced so that access, electrical changeovers and building works could progress while minimising disruption to the people and processes already operating across the two units.

RCS coordinated the electrical, building, security and data elements as one project. This gave the client a clear communication route and allowed each stage to be planned around the next, rather than leaving separate contractors to manage the interfaces between trades.

Electrical infrastructure and resilience

The electrical scope included the rewiring of both units and upgrades to the mains wiring so the infrastructure could manage the demands of the business. A UPS arrangement was incorporated to provide suitable resilience for critical requirements serving the two units.

The installation also included the data infrastructure required for the new office environment, bringing power, connectivity and the wider fit-out together within the same coordinated programme.

Security, fire protection and building works

A specialist alarm system was installed to provide additional protection for the client’s assets. The building work included a new mezzanine floor, together with associated improvements to existing areas for fire protection and safety.

RCS also created the new office working environment and kitchen facilities, transforming the units into spaces that better supported both industrial operations and the client’s staff.

The outcome

Over eight months, RCS delivered a £325,000 multi-discipline refurbishment while the business remained trading. The completed project gave the client upgraded electrical capacity, improved power resilience, enhanced asset security, additional usable floor space and a modern office, kitchen and data environment.

The works also supported the client’s wider preparation of the premises for sale. The property was subsequently sold. This project demonstrates RCS’s ability to manage substantial commercial work across electrical, building, safety, security and workplace systems—while retaining the direct communication and practical accountability of an owner-led contractor.

MTS commercial refit: working photographs

These photographs document stages of the 2024 refurbishment in Bulwell, from mezzanine construction and concealed services to floor finishes and office fitting. Installation photographs show work in progress; the captions identify the stage shown. Select any image to see the full photograph.

Mezzanine construction and internal preparation

Mezzanine floor construction, showing the supporting framework before the new decking was laid. MTS & Cool Repair, Bulwell.
Mezzanine floor construction, showing the supporting framework before the new decking was laid.
Insulation fitted within the metal stud wall framework before the wall lining was completed. MTS & Cool Repair, Bulwell.
Insulation fitted within the metal stud wall framework before the wall lining was completed.
Ceiling insulation and cable runs visible before boarding. MTS & Cool Repair, Bulwell.
Ceiling insulation and cable runs visible before boarding.
Window and wall-lining alterations during the internal fit-out. MTS & Cool Repair, Bulwell.
Window and wall-lining alterations during the internal fit-out.

Electrical installation stages

Distribution board wiring during installation, with the protective front cover removed. MTS & Cool Repair, Bulwell.
Distribution board wiring during installation, with the protective front cover removed.
Distribution board at a later stage, with the protective front cover and circuit labels fitted. MTS & Cool Repair, Bulwell.
Distribution board at a later stage, with the protective front cover and circuit labels fitted.

Floor preparation and coating

Upper-floor preparation before the grey floor finish was applied. MTS & Cool Repair, Bulwell.
Upper-floor preparation before the grey floor finish was applied.
The upper floor during application of the grey floor finish. MTS & Cool Repair, Bulwell.
The upper floor during application of the grey floor finish.
Ground-floor preparation beneath the new suspended ceiling and lighting. MTS & Cool Repair, Bulwell.
Ground-floor preparation beneath the new suspended ceiling and lighting.
Ground-floor coating stage, with equipment grouped at the rear of the workspace. MTS & Cool Repair, Bulwell.
Ground-floor coating stage, with equipment grouped at the rear of the workspace.

Office and welfare-room finishes

Office finishing stage, showing the lighting, carpet and perimeter electrical trunking, with floor protection still in place. MTS & Cool Repair, Bulwell.
Office finishing stage, showing the lighting, carpet and perimeter electrical trunking, with floor protection still in place.
Welfare-room fitting and tiling during the refurbishment. MTS & Cool Repair, Bulwell.
Welfare-room fitting and tiling during the refurbishment.

Planning work at your own business premises?

For similar requirements, explore our commercial electrical services in Nottingham and commercial refurbishment and dilapidations services.

For workplace improvements within your own premises, read about our office refurbishment service in Nottingham.

When you enquire, include the site location, the work you are considering, your preferred timescale and which areas or equipment need to remain operational. Available drawings, photographs and existing reports help us prepare for a useful first discussion.

Discuss your commercial project with RCS.

Have a requirement?

Let’s make the next step straightforward.

Tell us what needs installing, maintaining or putting right. We will help you establish the practical route forward.