Commercial EICR & Fixed Wire Testing in Nottingham

Commercial EICRs and fixed wire testing for businesses, landlords and facilities teams in Nottingham and the Midlands. We agree inspection scope, access and planned shutdowns before testing, with clear reporting and separately priced remedial work.

NICEIC Approved Contractor. Check RCS’s official NICEIC listing.

Already have an EICR or circuit schedule? Email it with your site postcode and say whether you need a new inspection, remedial work or both. Include any repairs already completed, your deadline and shutdown restrictions. If you have no previous report, use the quote form and tell us what you know.

What is a commercial EICR?

An Electrical Installation Condition Report records the condition of an existing fixed electrical installation at the time it is inspected and tested, within the stated extent and limitations. It identifies observations that need attention and includes the inspection and test information used to assess the installation.

Fixed wire testing concerns the building’s electrical installation, including relevant distribution equipment and circuits. It is a different service from portable appliance testing. Emergency lighting also has its own inspection and testing requirements; tell us if you want these workstreams coordinated during the same programme.

Distribution board with its front cover and circuit labels fitted during the MTS and Cool Repair refit
Distribution-board installation and circuit labelling from the MTS & Cool Repair refit in Bulwell. See the electrical work at Bulwell.

Agreeing the inspection scope

A useful quotation starts with a clear picture of the premises. An office with a small distribution board presents different access and shutdown requirements from a warehouse, workshop or building with several tenants. Before booking the work, we discuss:

  • The premises type, approximate size and areas to be included.
  • The number and location of distribution boards, available circuit schedules and previous reports.
  • Single-phase or three-phase supplies and any known faults or alterations.
  • Equipment, processes, IT systems or security systems affected by a power interruption.
  • Tenant and landlord responsibilities, restricted areas and access arrangements.
  • The intended inspection scope, any limitations and the reporting required.

If records are incomplete, let us know. A site review may be needed to understand the installation before the scope and price can be confirmed. Any agreed limitations should be clear in the report, so the person relying on it understands what was and was not inspected.

Access on different days? If an area you want inspected may be unavailable on the planned day, tell us when access can be arranged. Ask whether the inspection quote includes a separate visit for that area.

Planning testing in an occupied business

Some testing requires circuits to be isolated. We agree access and shutdown arrangements with your site contact before work starts, including who needs to be notified and which systems require a controlled shutdown and restart. Phasing or an out-of-hours arrangement can be discussed where the operation requires it.

Share details of critical equipment early. This allows the inspection plan to take account of your operational needs rather than discovering restrictions on the day. Access to boards, risers, plant areas and occupied rooms should also be arranged in advance.

Understanding the report and remedial work

Your EICR records the overall assessment, observations, inspection information and test results for the agreed scope. Observations use classification codes to communicate their significance: C1 identifies present danger, C2 a potentially dangerous condition, C3 a recommended improvement, and FI a need for further investigation. The report and accompanying explanation should make the required next steps clear.

RCS can explain the findings and provide a defined quotation for remedial work. The priority, access needs and commercial basis of follow-on work are discussed before it proceeds. Where repairs or alterations are completed, the relevant certification or records are provided for that work. Keep these with the original inspection report so your property records show what has been addressed.

For background on inspection and report terminology, see NICEIC’s EICR guidance. The assessment and recommendations for your premises must be read in the context of your own report.

How often should commercial electrics be inspected?

There is no single interval suitable for every commercial installation. The appropriate inspection programme depends on the type and use of the premises, its condition, the environment and maintenance history, alongside relevant requirements for your organisation. Start with the recommendation in the existing report and discuss any changes of use, deterioration or known faults with a competent electrical contractor.

An inspection date is not a reason to leave a known fault unattended. HSE explains the importance of maintaining electrical systems safely in its electrical maintenance guidance.

Commercial experience and ongoing support

RCS’s commercial EICR experience includes completed reports documenting the inspection scope and limitations, observations and circuit test schedules.

At MTS & Cool Repair in Bulwell, RCS delivered electrical upgrades and rewiring as part of a refurbishment across two operational industrial units. The MTS commercial refit case study shows our experience of coordinating electrical and building work around an active business.

Inspection findings can feed into an agreed planned maintenance contract, with separate approval for additional repairs. For wider requirements, explore our commercial electrical contracting service and support for facilities and procurement teams.

Questions before booking

Can you quote from our previous EICR?

A previous report and circuit schedules are useful starting points. We also need to understand changes since that inspection, present access restrictions and the work you want covered. We will confirm whether a site visit is needed.

How much does commercial fixed wire testing cost?

The price depends on the agreed scope, installation size, number of circuits, access and shutdown arrangements, and the quality of existing records. RCS provides a quotation for your premises, with remedial work identified separately. When comparing quotations, check that the extent of inspection, proposed limitations, reporting and working hours are equivalent. Our quotation shows the net amount, applicable VAT and total clearly.

What if our landlord or insurer has requested the report?

Send their written requirements with your enquiry, including the premises covered, the required delivery date and any reporting or contractor criteria. We can review these alongside the proposed inspection scope before confirming the booking. Any acceptance criteria should be checked with the organisation requesting the report.

When will we receive the EICR?

Ask us to agree the reporting timescale as part of the quotation. Tell us about any renewal, occupation or handover deadline when you enquire, so the inspection date and reporting requirements can be considered together.

Can you support several sites?

Yes. We can discuss a programme across a commercial portfolio, agreeing site contacts, access, priorities and reporting. Local work is supported from Hucknall, with wider and national programmes considered around their delivery requirements.

Request a commercial EICR quotation

Send your site postcode, premises type, previous report if available, preferred timescale and any restrictions on switching off power. We will discuss the scope and the next practical step.

Shortlisting a contractor?

Review our commercial experience and independent customer feedback, or share the capability pack with your team before getting in touch.

NICEIC Approved Contractor. RCS has been NICEIC certified since May 2019. Check the official NICEIC listing