Planning a Commercial Strip-Out: What Your Contractor Needs
Have a brief ready? Discuss your strip-out.
Commercial Advice / Strip-out planning
Practical advice from RCS Maintenance Group · 24 October 2026
A commercial strip-out brief should show the contractor what must be removed, what must remain and how the premises need to be handed back. A list saying “clear the unit” leaves important decisions unresolved: live services, retained finishes, access, removal routes and the condition expected at completion.
For tenants, landlords and facilities teams, the useful starting point is a marked-up plan and an agreed schedule of work. These give each trade the same reference and help identify decisions that must be made before a programme can be confirmed.
RCS project film · 49 seconds
Skylight: four levels, two weeks, one coordinated strip-out
Crane operations, dismantling and site coordination from the completed Tobacco Dock programme.
Read the skylight film transcript
Four levels. Two weeks. One coordinated strip-out. At Skylight Rooftop Bar, Tobacco Dock, RCS brought together dismantling, electrical, plumbing and specialist lifting work. Rooftop structures. Commercial kitchens. Containers above a central London site. Each workstream had to fit the sequence. For your own premises, start with what stays, what goes, the access constraints and the handover date. Then agree the records and follow-up work. Speak to RCS Maintenance Group about commercial strip-out, refurbishment and regular maintenance.
Assembled from genuine project photographs with narration, music, captions and animated RCS branding.
Watch the portrait version for phones · Explore the full project case study →
Start with the agreed end condition
Mark areas and items as retain, remove, protect or investigate. Include fixed fittings, furniture, signage, equipment and any landlord-owned installations. Identify who can approve a change when the survey reveals something different from the information supplied.
Example scope list for pricing
Give each item a reference, location and proposed action. Note the finish to price and who needs to confirm any open decisions. Send the same list to each contractor so their quotations can be compared.
- 01 · Lobby partition · Remove. Include making good the fixing holes to the agreed finish. Confirm the finish at the site survey.
- 02 · Landlord fire alarm · Retain. Keep it in service. List any proposed changes as separate items for approval.
- 03 · Kitchen extract duct · Investigate. Ask for the shared branch to be checked and keep its removal outside the confirmed scope until the boundary is agreed.
Where the work relates to a lease, use the written scope agreed with the relevant parties and advisers. A works quotation needs that scope; it does not determine the parties’ lease obligations. Keep disputed or undecided items visible so that they are not treated as instructions to remove something. If the agreed handback includes making good after removal, see our commercial dilapidations and reinstatement service.
Separate services from general dismantling
List electrical, plumbing, fire-alarm, data and other systems that may be affected. Identify shared services, areas that remain occupied and equipment that must continue operating. Ask the contractor what surveys, records and specialist input are needed before the sequence is agreed.
Record who controls proposed interruptions and who accepts the resulting handover information. Avoid treating an unknown cable, pipe or connection as redundant because it appears to serve an area being cleared.
Briefing a commercial kitchen strip-out
- Equipment ownership. Mark leased appliances and landlord fixtures. Note anything the owner will collect separately and when.
- Shared services. Flag extraction ductwork or drainage that serves other areas. Identify what stays and who can confirm where the work stops.
- Handback finish. Say whether the agreed scope includes removing wall cladding or making good floors, or whether those surfaces stay for the next fit-out.
Send your kitchen strip-out brief with the site postcode and target date.
Show the removal route, not just the room
A bulky item may fit in the room but be difficult to remove through the building. Supply available dimensions, floor levels, loading arrangements, access hours and restrictions on lifts or shared routes. Flag neighbouring operations and areas the public use.
Identify heavy, elevated or unusual assets early. Their removal may require specialist planning that affects the rest of the programme. Photographs help explain the site, but the contractor may still need a survey before confirming the method or delivery period.
Agree who collects and clears materials
Give each contractor the same list so you can compare what their quotations include.
- Items for reuse or return. List equipment and fittings the owner, supplier or another contractor will collect. Note when they can collect them.
- Waste and clearance. Mark which materials the strip-out contractor should remove and flag anything that needs to be kept separate.
- Records for handover. Say what disposal records you need, who should receive them and by when.
Connect the dates to decisions
Give the required handover date alongside the dates when surveys, approvals, access and service interruptions can be arranged. Explain whether the date is fixed and what other activity depends on it. Allow for checks and outstanding items before the final handover.
For construction work, HSE’s guidance for commercial clients explains the importance of suitable management arrangements, sufficient time and resources, and pre-construction information. Resolve the project responsibilities early.
A project lesson from Skylight, Tobacco Dock
RCS’s completed Skylight programme covered four levels of nightclub, bar and event installations. Dismantling, electrical, plumbing, kitchen removal, material recovery and specialist crane operations had to work as one sequence within a restricted central London site.
The programme was completed in two weeks against a three-week deadline. That is a specific past project result; your own programme will depend on its scope, surveys, access and approvals. See the full Skylight project case study for the work and photographs behind the film.
Plan the handover and the next use
Agree how completed work, retained assets and outstanding decisions will be recorded. Identify who will receive the premises and who will take responsibility for any continuing maintenance. If another fit-out follows, share the relevant records with the next team rather than losing them between projects.